HOW IT WORKS THE 6 STAGE PROCESS

Number-1HEATING

The portable thermal heater is positioned over the defect area, An 8 minute pulsed heat cycle allows the fully controllable and efficient NIT heater to penetrate the wearing course to relinquish its strength, creating a workable material without carbonising or damaging it in the process.

Number-2SCARIFICATION

To deliver a strong seamless joint, operators scarify an area 50mm in from the repair edge. This ensures integrity of the heated thermal joint between new and existing material. No material is taken from the repair, everything is recycled in-situ, resulting in no waste or landfill.

Number-3REJUVENATION

High-grade enriched emulsion is added to the repair area. This is evenly mixed through the recycled material to deliver a consistent and even exposure. This recoats the recycled aggregate increasing bitumen content to near ‘new materials’ levels.

NEW MATERIALNumber-4

Material is supplied in 25kg bags for ease of use and is fed to and from the on board hot-boxes. New material is heated to 100°C before being transferred to the repair area. Sufficient levels of material are added to create a level repair following compaction.

CHECKING TEMPERATURENumber-5

An infrared thermometer is used to check the temperature of the repair area, material temperature should be typically between 70-100°C to provide the best compaction conditions. This many vary depending on material used.

COMPACTIONNumber-6

Compaction equipment is specified in line with the repair area’s requirements. All edges are compacted to create a mechanical interlock with the surrounding surface.

FASTER, MORE COST-EFFECTIVE

The nu-phalt™ Thermal Road Repair System has been proven to reduce costs by up to 40% when compared to traditional pothole repair methods.

At approximately half the repair time of other methods, the system can significantly reduce your pothole backlog, while minimising disruption to road users and the public.

The inherent speed and efficiency of the process ensures it uses significantly less energy than conventional alternatives.

Furthermore, because it recycles the existing surface in-situ, minimal new material is required – which means there are no recycling or disposal costs.

LONGER-LASTING

Recurring defects are costly and time-consuming, which is why nu-phalt™ has a ‘right first time’ philosophy.

The process delivers a permanent repair with a seamless joint.

WHY NU-PHALT™?

  • Dedicated team
  • 25 years experience
  • ISO certification

SPECIALIST EXPERTISE

  • Dynamic Systems
  • Range of Heaters & Vehicles
  • Systems for 1-50 Vehicles
  • Cost Saving & Green